Production KPIs
KPI |
Parameter |
Asset Tag |
Definition |
Load/Pass Count and Cycles |
Loads/Day |
Hauler – Load & Haul Loader – Load & Haul Scraper |
Total cycle count for cycles of all assets (based on selected asset tag) of respective jobsite ÷ Number of productive days for the selected date range. Productive days are considered when |
Loads/Shift |
Hauler – Load & Haul Loader – Load & Haul |
Total loads in selected shift ÷ Total number of productive shifts for the selected date range. |
|
Cycles/Day |
Load Out |
Total cycle count for cycles in the load or dump zone of respective jobsite ÷ Number of productive days for the selected date range. |
|
|
All |
Typical cycle duration of the respective jobsite based on selected date range and asset tag. |
|
Load Out Cycle Time |
Load Out |
Typical cycle duration in the load or dump zone of respective jobsite. |
|
Loads/Hour |
Hauler – Load & Haul Loader – Load & Haul Scraper |
Total cycle count for cycles of all assets (based on selected asset tag) of respective jobsite ÷ Sum of maximum runtime value of all assets of respective jobsite based on the selected date range and asset tag. |
|
Cycles/Hour |
All |
Total load for cycles of all assets (based on selected asset tag) of respective jobsite ÷ Sum of maximum runtime value of all assets of respective jobsite based on the selected date range and asset tag. |
|
Hauler or Scraper Load Time |
Hauler – Load & Haul Scraper |
Typical load segment duration for cycles based on the selected date range and asset tag. |
|
Loader Cycle Time |
Loader – Load & Haul |
Typical cycle duration for the selected date range. |
|
Pass Count/Cycle |
Hauler – Load & Haul |
Typical loader pass count for load haul dump cycles for the selected date range. |
|
Pass Count |
Load Out |
Typical loader pass count associated to trucks loaded by the loader selected. |
|
Payload |
Payload/Hour |
All |
Total payload for all the assets (based on selected asset tag) of respective jobsite ÷ Total run time of all assets of respective jobsite based on the selected asset and date range. |
Payload/Cycle |
All |
Total payload of all assets ÷ Total number of all cycles based on the selected date range. |
|
Payload/Fuel |
All |
Total payload of an asset ÷ Total fuel burned by the asset. |
|
All |
Summation of the total weight measured or estimated for the selected date range.
|
||
Segment
|
Total Runtime |
All |
Sum of working hours and substates (long, medium, short and productive) idling hours of all assets based on the selected date range and asset tag. |
Empty Stopped Time |
Hauler – Load & Haul Scraper |
Sum of all empty stopped segments duration for all the assets based on the selected asset tag and jobsite. |
|
Stopped Time |
Loader – Load & Haul Load Out |
Sum of loaded and empty stopped segments duration of all assets for selected asset tag. If the loader is not capable of Advanced Productivity, then this value is not available. |
|
Loaded Stopped Time |
Hauler – Load & Haul Scraper |
Sum of all loaded stopped segments for all the assets based on the selected asset tag and jobsite. |
|
Roading Time |
Loader – Load & Haul Load Out |
Sum of roading cycles duration for assets of the selected asset tag based on selected date range. If the Loader is not capable of Advanced Productivity, then this value is not available. |
|
All |
Stores the duration of engine shutdown events occurring at the end of a shift, during a cycle. It resolves the issue of long segment durations assigned to Loaded Stopped and Empty Stopped events, and stores data during a cycle when a machine is shut down, regardless of the shift. The last cycle of the day can be viewed without having to wait for the next load.
|
||
Pile Cleanup Time |
Loader – Load & Haul Load Out |
Sum of pile cleanup cycles duration for all assets of the selected asset tag based on selected date range. If the loader is not capable of Advanced Productivity, then this value is not available. |
|
Hauler/Scraper Cycle Time |
Haulers Scrapers |
Typical cycle duration of the respective jobsite based on selected date range and asset tag. | |
Estimated Volume |
Hourly Production |
Hauler – Load & Haul Scraper |
Total volume moved for number of completed load haul dump cycles of respective jobsite ÷ Sum of maximum runtime value of all assets (based on selected hauler or scraper) for the selected date range |
Volume/Day |
Hauler – Load & Haul Scraper |
Total volume moved for number of completed load haul dump cycles of respective jobsite of all assets (based on selected hauler or scraper) ÷ Number of productive days for the selected date range. |
|
Total Volume | All | Total volume moved of cycles for the selected date range. | |
Hauler/Scraper Cycle Time |
Hauler – Load & Haul Scraper |
Typical cycle duration of the respective jobsite based on selected date range and asset tag. | |
Measured Volume
|
Volume Completed/ Day |
Grade Compact |
Total cut and fill volume ÷ Number of days with operation. |
Cut Volume Completed |
Total cut volume for the selected date range. |
||
Fill Volume Completed |
Total fill volume for the selected date range. |
||
Cut Volume Remaining |
Difference of cut volume remaining for the selected date range. |
||
Fill Volume Remaining |
Difference of fill volume remaining for the selected date range. |
||
Grade Percent |
Grade |
Area on Grade ÷ Total area reported by asset * 100. |
|
Grade Volume Remaining |
Difference of volume (cut and fill remaining) for the selected date range. |
||
Compact on Grade Percent |
Compact
|
Area on Grade ÷ Total area reported by asset * 100. |
|
Compact Coverage |
Total surface area reported by the assets on the selected date range. |
||
Compact Volume Remaining |
Difference of volume (cut and fill remaining) for the selected date range. |
Compaction Metrics
This includes metrics for Compact asset tag that are not visible in the KPI cards within Jobsite Summary.
- Compaction Meter Value (CMV): Refer to Insights Map to learn more.
- Machine Drive Power (MDP): Refer to Insights Map to learn more.
- Cat Compaction Algorithm (CCA): Refer to Insights Map to learn more.
- Total CCA Completed: Total CCA completed for single or multiple compact assets for last seven days.