- + jobsite
- acceptable use policy
- account
- add user
- android
- answer
- april 2020
- archive
- asset tags
- assets
- assign schedule
- august 2020
- august 2021
- august 2022
- Average
- body up switch
- browser
- carbon footprint
- card error
- change KPI
- chrome
- CO2 emitted
- cookie
- copy site
- copyright
- cost kpi
- cost setup
- cost tab
- create
- currency
- custom list
- cut/fill
- dashboard
- december 2019
- december 2020
- december 2021
- delete site
- delete user
- digital offering
- dollar
- edit site
- edit targets
- edit user
- euro
- exemption
- FAQ
- favorite
- february 2020
- fill/dump
- filter
- firefox
- fleet
- frequently asked questions
- geofence
- getting started
- grid
- guide
- help
- ID
- insights reports
- introduction
- ios
- january 2020
- january 2021
- january 2022
- july 2020
- june 2022
- KPI
- KPI hierarchy
- landing page
- legal
- list
- list summary views
- load site
- login
- logout
- machine
- map tab
- march 2021
- march 2022
- material
- material list
- may 2020
- may 2021
- may 2022
- measurement
- more option
- november 2021
- october 2020
- october 2021
- october 2022
- overview
- playback view
- policy
- preferences
- primary KPI
- production tab
- productivity
- productivity insights
- question
- remove site
- renminbi
- report management
- report type
- restore site
- review
- safari
- schedule
- select assets
- september 2020
- set name and location
- shift
- shift comparison report
- step 1
- step 2
- step 3
- step 4
- step 5
- stockpile
- summary tab
- support
- telematics
- total cost
- user
- visionlink
- walkthrough
- zones
Cost (Site) KPIs
Select Total Cost from the KPI list on Cost to view sum of all costs incurred by the selected asset tag during the selected date range.
On clicking any:
-
Column, an info card displays the cost breakdown under Total Cost.
-
Zone in the map view below, an info card displays the Zone Name, Type, Number of Machines and the Working and Idle Cost.
-
Asset Info Card on the right of the map view, you can select a KPI, and view asset-wise information.
The following are the cost KPIs measured and tracked in VisionLink Productivity:
KPI |
Parameter |
Definition |
Total Cost |
Sum of Operating and Working Fuel Cost of all assets in the site for the selected asset tag.
|
|
Sum of Operating and Idle Fuel Cost of all assets in the site for the selected asset tag.
|
||
Total cost of all assets ÷ Site operational time of all assets, based on selected date range and asset tags. |
||
Total cost of all assets ÷ Total payload moved by all assets, based on selected date range and asset tags. | ||
Cost/Volume | Total cost of all assets ÷ Total cubic yard moved by all assets, based on selected date range and asset tags. |