January 2020

 

Addition of Assign Schedule Step in Create Site

Now, schedule shifts for the assets with a maximum of three shifts per 24 hours and a maximum of 12 hours per shift. Assign Schedule is an optional step when creating a site.

 

Enhancements in Productivity Insights

The following enhancements are available in Productivity Insights:

  • Utilization tab is now included in Productivity Insights. Easily analyze asset level details for determining the root cause parameters for utilization downfall of selected site.

  • Playback View is available in Asset & Cycle column of Production. You can now play and view the movement of assets between load and dump sites in map for 24 hours.

 

Site Summary Enhancements

Several feature enhancements have been made in the Site Summary:

  • Segment KPI is now listed under Production. View the segment details of respective site.

  • The map view and asset details are displayed for Payload KPI in Production. View loading and dumping zones of site in map.

  • Send recent site images through mail to support team for processing and view the uploaded site images under layers section in Site Summary map.